US-93, Blue Lakes Blvd. and Pole Line Rd. Intersection Improvements Project

This project, anticipated to begin summer 2025, will evaluate feasible and constructable alternatives to improve safety and mobility in the Blue Lakes Boulevard and Pole Line Road area into 2050.

The project will have a strong value planning component. Value planning is a process to collaborate with many individuals to solve complex problems to maximize the benefits for the users.

The outcome will be a range of short-, mid-, and long-term projects to improve mobility in the area.

Potential Ideas*:

  • Widen intersection/add thru lanes

  • Lengthen left turn pockets

  • Triple lefts

  • Single-point urban interchange (SPUI) 

  • Add bridges/flyover interchange

*List is not exhaustive

Project Schedule

Blue Lakes Pole Line Schedule.png

Click to view a larger PDF in a new window

Blue Lakes Pole Line Traffic Graphic.png

Click to view a larger PDF in a new window

Partnership

For concerns or comments:

Brock Dillé, P.E.
Project Manager
brock.dille@itd.Idaho.gov

208-544-7906

Courtney Wagner
Public Information Officer

courtney.wagner@itd.idaho.gov
208-886-7805

US-93, Blue Lakes Blvd. and Pole Line Rd. Intersection Improvements Project

SH-50/US-30 Corridor Project
(Red Cap Corner to I-84)

ITD is evaluating the current and future conditions of the SH-50 corridor, including roadway improvements such as widening or replacing the Hansen Bridge, as well as conducting a safety analysis for both SH-50 and US-30 from Eastland Drive to Red Cap Corner.

Bridge Facts

  • Opened in 1966

  • Only two lanes and 28 feet wide

  • 762 feet across the canyon

  • Concrete deck on four steel girders with four spans (202/258/200/102-foot-long spans)

  • Two of the tallest piers in the U.S. at 338 feet each

  • ITD has the highway right of way clear for four miles to widen SH-50 to five lanes

  • Twin Falls alternate if US-93 closed, eight miles upstream from Perrine Bridge

  • 24% heavy vehicle traffic (AADT 10,122)

14520_0622_01.JPG

Project Schedule

sh-50 us-30 schedule.png

Click to view a larger PDF in a new window

Project Area

Red Cap Corner_Map.png

Click to view a larger PDF in a new window

For concerns or comments:

Darren LaMay, P.E.
Project Manager
darren.lamay@itd.idaho.gov​

208-334-8503

Courtney Wagner
Public Information Officer

courtney.wagner@itd.idaho.gov
208-886-7805

SH-50/US-30 Corridor Project (Red Cap Corner to I-84)

Thank you for participating!

This concludes the online public meeting. We will review your comments and look forward to utilizing them as we enter the environmental phase of this project. If you have questions regarding the Snake River Crossing Project, please reach out to the team using the contact information below.